• Project Name
  • Jains West Minster - Saligramam 
  • Project Description
  • A home befitting royalty, Westminster is a rich enclave of 618 premium apartments, spread across 17 captivating residential floors enveloped by pristine greenery. This palatial development is crafted with top-of-the-line fixtures and finishes, luxurious amenities and enchanting landscaping, ensuring lifestyle for its privileged residents, day after day. Proudly housing an extensive range of impeccably appointed 1, 2 and 3 BHK apartments that span between 564 to 1961Sq.ft in size. Westminster reflects opulence in every square foot, right from the ornate lobby and majestic stairways to the sophisticated lounges and the alluring selection of superlative lifestyle amenities.

     
  • Amenities
  •  
  • No of Flats
  • 618 
  • No of Blocks
  • No of Floors
  • B + S + 17 
  • No of Bed Rooms
  • 1, 2 & 3 BHK 
  • Completion date
  • August 2014 + 3 Month Grace Period 
  • Investment Range
  • 1BHK - 60 Lacs, 2BHK - 1.01Cr., 3BHK - 1.35Cr. 
  • Status
  • Under Construction 
  • Location Map
  •       
      
  • Virtual Tour
  •  
      

  • Specification
  • Flooring

    a) The flooring in living, dining, bedrooms, and kitchen will be of Vitrified tiles. The flooring in balconies, toilets & wash area will be of first quality anti skid ceramic tiles.

    Wall Tiling

    a) Kitchen will have first quality ceramic wall tiles for 2 feet above the platform.
    b) Toilet will have first quality ceramic wall tiles for 7 feet height from floor level.
    c) Service areas will have ceramic tile for 3 feet height.

    Kitchen

    a) Black granite of size 8’0”x2’0”or 10’0”x 2’-0” will be provided.RCC platform can be provided on request.
    b) Porcelain sink/Stainless steel sink without a drain board will be provided.
    c) One loft of RCC will be provided in the kitchen.

    Doors / Windows / Ventilators

    a) Main door will be made of teak wood frame with Paneled skin door shutter.
    b) Bedroom doors will be made of teak wood frame with flush shutters.
    c) Toilet doors will be made of teak wood frame with flush shutter. One side of the door will have PVC lamination for suitable height or sintex PVC doors or equivalent.
    d) UPVC/Anodized aluminium French doors with sliding shutter and without grill will be provided.
    e) UPVC/Anodized aluminium with sliding shutter will be provided for all windows except kitchen. Anodized aluminium windows with sliding shutter for kitchen and anodized aluminium ventilator for toilets will be provided.


    Painting Finishes

    a) All walls will be coated with putty and finished with emulsion paint.
    b) Ceilings will be finished with OBD.
    c) External walls will be finished with Supercem cement paint or equivalent.
    d) Main door will be of Melamine finish.
    e) All other doors will be finished with enamel paint.
    f) Windows and Ventilator grills will be finished with enamel paint.

    Electrical

    a) Three-phase supply with concealed wiring will be provided. The actual supply will be single or three phases based on the TNEB rules and regulations at the time of energizing the complex.
    b) Separate meter will be provided for each flat in the main board located outside the flat at the place of our choice.
    c) Common meters will be provided for common services in the main board.
    d) In 3 bedroom apartment- A/C provision with electrification will be provided in two bedrooms and only pipe provision in the third bedroom
    In 2 bedroom apartment- A/C provision with electrification will be provided in one bedroom and only Pipe provision in the second bedroom.
    In single bedroom apartment A/C provision with electrification will be provided.
    e) 15A plug points will be provided for Refrigerator, Washing machine and Geyser in toilets.
    f) The wiring for 5A points will be of 1.5sq.mm rating adequate for equipments of capacity of 750W and 15A points will be of 2.5sq.mm rating adequate for equipments of capacity of 1500W. AC wiring will be of 4 sq.mm which can take up a capacity of 2 tones.
    g) Standby generator for min. essential points inside all apartments and for essential points in common areas will be provided.

    TV and Telephone Cable

    a) TV and Telephone points will be provided in Living and Master bedroom.
    b) The cables for TV and Telephone will be provided at a suitable location in living.

    Plumbing & Sanitary

    a)All toilets will be provided with wall mounted closet.
    b) Dining will be provided with designer washbasin.
    c) High quality chromium plated fittings will be provided in toilets.


     
  • Payment plan
  • On Booking 10%
    Within 30 days 30%
    On completion of Foundation 10%
    On completion of 4th floor roof slab 10%
    On completion of 8th floor roof slab 10%
    On completion of 12th floor roof slab 10%
    On completion of 17th floor roof slab  10%
    On completion of flooring 5%
    During Handing over 5%

    The project is approved by all major banks and easy loan facility is available from the banks.

     
  • Brochure
  • Quick Contact :

    Chennai : 044-49494477

    E-Mail: imd@jainhousing.com

    If you are unsatisfied with the response of any of our executives or require any further information,
    Please write to: feedback@jainhousing.co.in