Jains Pebble Brook Phase II

Block 9, Vivekananda Nagar, Thoraipakkam, Chennai, Tamil Nadu 600097, India

Base Price : 62 Lacs +

Book Now
Actual
Gallery
  • PB-phase

  • 384

    No.of Units
  • 2,3 BHK Apartment

    Configurations
  • Ready To occupy

    Possession
  • 1036 sqft - 1718 sqft

    Sizes

OVERVIEW

Status: Ready To occupy

Jain Housing proudly presents Jains Pebble Brook Phase II, a sparkling celestial star on the firmament of contemporary living in the speedily upcoming residential zone of Thoraipakkam. This stylish new residential development boasts of sophisticated architectural designs and refreshing scenic beauty with an enviable package of ultra-modern, high-tech comforts and superior features designed to make sure that you live a life of great luxury and grandeur.

NO OF FLATS NO OF BLOCKS NO OF FLOORS NO OF BEDROOMS
384 8 S + 4 2,3

SPECIFICATION

Flooring

  • The flooring in living and dining will be of 3’x3′ vitrified tiles, bedrooms, and kitchen will be of vitrified tiles.
  • The flooring in balconies, toilets & wash area will be of first quality anti skid ceramic tiles.

Note: Size, Color and brand will be of our choice depending on bulk availability.

Wall Tiling

  • Kitchen will have first quality ceramic wall tiles for 2 feet above the platform.
  • Toilet will have first quality ceramic wall tiles for 7 feet height from floor level.
    Service areas will have ceramic tile for 4 feet height.

Note: Size, Color and brand will be of our choice depending on bulk availability.

Kitchen

  • Black granite of size 8’0”’x2’0” will be provided.RC platform will not be provided.
  • Porcelain sink/Stainless steel sink without a drain board will be provided.
  • One loft of RCC will be provided in the kitchen.

Doors / Windows / Ventilators

  • Main door will be made of teak wood frame with teak veneered moulded Panel Door.
  • Toilet doors will be made of teak wood frame with skin shutter. One side of the door will have PVC lamination for suitable height or sintex PVC doors or equivalent.
  • UPVC windows with sliding shutter shall be provided for all windows except kitchen. Anodized aluminium windows with sliding shutters for kitchen and anodized aluminium ventilators for toilets will be provided.
  • UPVC French doors with sliding shutter and without grill will be provided.

Note: Grill fixing for balconies facing road O.S.R, landscaped area and canal will not be entertained.

Painting Finishes

  • All walls will be coated with putty and finished with emulsion paint.
  • Ceilings will be finished with OBD.
  • External walls will be finished with APEX or equivalent.
  • Main door will be of Melamine finish.
  • All other doors will be finished with enamel paint.
  • Windows and Ventilator grills will be finished with enamel paint.

Note: The color of the paint wherever not mentioned will be as per our choice

Electrical

  • Three-phase supply with concealed wiring will be provided. The actual supply will be single or three phases based on the TNEB rules and regulations at the time of energizing the complex.
  • Separate meter will be provided for each flat in the main board located outside the flat at the place of our choice.
  • Common meters will be provided for common services in the main board.

In 3 bedroom apartment:

  • A/C provision with electrification will be provided in two bedrooms and only pipe provision in the third bedroom.

In 2 bedroom apartmnet:

  • A/C provision with electrification will be provided in one bedroom and only pipe provision in the 2nd  bedroom.

In single bedroom apartment:

  • A/C provision with electrification will be provided.
    15A plug points will be provided for Refrigerator, Washing machine and geyser in toilets.
  • The wiring for 5A points will be of 1.5sq.mm rating adequate for equipments of capacity of 750W and 15A points will be of 2.5sq.mm rating adequate for equipments of capacity of 1500W. AC wiring will be of 4 sq.mm which can take up a capacity of 2 tones.
  • Standby generator for min. essential points inside all apartments and for essential points in common areas will be provided.

TV and Telephone Cable

  • TV and Telephone points will be provided in Living and master bedroom.
  • The cables for TV and Telephone will be provided at a suitable location in living.

Plumbing & Sanitary

  • All toilets will be provided with wall mounted closet.
  • Dining will be provided with designer washbasin.
  • High quality Jaquar fittings or equivalent will be provided in toilets.

 Common Amenities

  • An overhead tank of required capacity will be provided for bore well and metro water.
  • Deep bore wells will be provided. The depth will be decided by us based on the yield.
  • Lift of Johnson/OTIS/Schindler or equivalent make will be provided.
  • Sump for required capacity of water will be provided.
  • Standby generator backup will be provided for essential points in common areas and minimum essential points inside the apartments.

Salient Features

  • Landscaped pathway will be provided for the entire stretch, which will enhance the appearance of the main entrance to the apartment.
  • The entrance pathway to the apartment lobbies will be paved with natural pavers.
  • Ground floor lobby will be of marble/granite flooring.
  • All amenities namely children’s play area will be common for both Phase 1 and Phase 2.

EXPLORE YOUR NEIGHBOURHOOD - MAP VIEW

EMI CALCULATOR

ASSOCIATED BANKS

  • lic
  • hdfc
  • icici
  • axis

Similar Properties